Home\Real Estate\Search Results\921 Lighthouse Lagoon Court, Panama City Beach, FL 32407

921 Lighthouse Lagoon Court, Panama City Beach, FL 32407

#776451

RES

4/3

Built in 2005

$974,000

Details

Deep water executive home with significant upgrades and a 10,000-pound boat lift accommodating a 37-foot boat with 4+ foot draw with easy access to the Bay, Shell Island, and the Gulf of Mexico, PLUS there is a commercial-grade seawall, covered boathouse with lift. There is additional room to install another lift for another boat or jet ski if you need it. Superior-grade deck material for easy maintenance and longevity. This magnificent home sits on a double-lot in a private, gated community. This 4BR/3BA, 3,241sqft property, offers an exceptional investment opportunity and is perfect for a primary residence or second home (vacation rentals not allowed). Upgraded to satisfy discerning tastes, the property features an entertainment-ready floorplan, and the ability to include all furnishings. 1st first-floor primary bedroom, a separate lock-out guest suite, an outdoor kitchen with grill, 2 new HVACs (2021), and an open concept kitchen with new appliances (2021). Some of the many upgrades include: hardwood and tiled floors, vaulted and trayed ceilings with recessed lighting, 10-foot ceilings, transom windows, pocket doors, designer colors, large baseboard molding, and a built-in sound system. The first floor has a huge game room with billiards or entertainment on one end and a room for relaxing and watching TV on the other. There is also a large guest room with a private bath with granite countertop. The 2nd floor gourmet kitchen has custom cabinets, granite countertops, and stainless steel appliances. The vaulted great room has a beautiful fireplace with built-in shelves and cabinets, along with tongue and groove paneling. The huge sunroom is bright and airy and opens onto a 10'X 38' screened porch. There are 2 more bedrooms and a full bath with granite countertops on the second floor. The 3rd floor is the master suite with a huge bathroom with a jacuzzi tub and a separate shower. Large walk-in closet and screened balcony complete this beautiful home. A home located on a double lot, with deep water, and Gulf access at this price point is hard to find. This home is great for the growing family or entertaining, and is close to shopping, restaurants, entertainment, and white sandy beaches, and is the only home in this development that sits on a double lot. Call for your private showing today.
GENERAL
Real Estate Type RES
Full Bathrooms 3
Half Bathrooms 0
One Quarter Bathrooms 0
Three Quarter Bathrooms 0
Lot Size 0
Real Estate Sub Type SingleFamilyResidence
Stories 0
Year Built 2,005
Lot Size Units Acres
Lot Size Area 0
Lot Size Dimensions 100x87
Agent Key 27,028,825
Agent MLS Id B1236
Office Key 5,952,703
Source System Name Central Panhandle Association of REALTORS®
Source System Id TRESTLE
Office Phone 850-654-2900
Agent Url http://www.MHerringRealEstate.com
Elevation 0
Parcel Number 27343-305-000
Number Of Units Total 0
Tax Legal Description HARBOUR COVE VILLAGE 68B1 LOTS 5 & 6 ORB 4597 P 2185
Internet Address Display True
Internet Automated Valuation Display True
Agent Name Mike S Herring
Agent Email [email protected]
Agent Cell 850-321-0917
Agent Office 850-654-2900
Broker Id BKWR
Office Name Keller Williams Realty Emerald
Listing Contract Date 7/18/2025
Square Feet 3,241
Days On Market 100
Status Active
BUILDING
Heating Electric
Style Coastal
Exterior Features Balcony
CoveredPatio
Deck
OutdoorShower
Appliances Dishwasher
Microwave
Refrigerator
Fireplace False
Parking Total 0
Parking Features Attached
Garage
GarageDoorOpener
Waterfront Features CanalAccess
Waterfront
Rooms 5
Security Features GatedCommunity
Utilities ElectricityAvailable
Patio And Porch Features Deck
Balcony
Private Pool False
Spa False
LOCATION
Subdivision Harbor Cove Village
View Canal
Directions Take Hwy 98 East from Hwy 79 to Wildwood and turn left (North). Turn right (East) on Hibiscus until Lighthouse Lagoon Court. Enter the gate and home is on the left.
County Bay
Waterfront True
SCHOOLS
Elementary School Breakfast Point
Middle School Breakfast Point
High School Arnold

Questions